Rainwater is a Resource
0
SBS Tank ST10R03 – 30.6K Gal, 100 MPH Wind Rated, NFPA 22 CompliantSBS Tank ST10R03 – 30.6K Gal, 100 MPH Wind Rated, NFPA 22 Compliant

SBS Tank ST10R03 – 30.6K Gal, 100 MPH Wind Rated, NFPA 22 Compliant

💧 Low-Profile Cyclonic‑Rated Steel Water Tank for Fire Protection & Storage
━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━

🛠️ Product Overview

The SBS Tank ST10R03 is a low-profile, high-durability steel reservoir designed for fire protection and potable storage applications in moderate-space installations. Built for 100 MPH wind zones and full NFPA 22 compliance, it features Galvalume® G300 steel walls, a self-supporting dome roof, and a certified liner for long-term corrosion resistance and water safety.

━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━

📞Contact Us for freight quote and lead time (Typical delivery time: 12–16 weeks)

━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━
Product Brochure:



Tank Sizing Chart:

$11,950.32
Choose Quantity :
View Details
Product Information
Product Details

📏 Key Specifications

  • Capacity: 30,591 gallons (gross), 24,500 gallons (usable)

  • Model Number: ST10R03

  • Diameter: 24′ 8″

  • Height: 10′ 5″

  • Wall Panels: Galvalume® steel, G300 grade with AZ150 coating

  • Roof: Self-supporting corrugated dome roof

  • Liner: NSF/ANSI 61-certified synthetic liner

  • Wind Rating: Up to 100 MPH

  • Seismic Rating: Earthquake zone compatible

  • Tank Color: Mill-finish (silver); optional powder-coated exterior

  • Bolt Design: M10/M12 hot-dip galvanized high-tensile bolts

  • Nozzles: 2″–6″ galvanized steel or optional HDPE/stainless steel

  • Lifespan: 60+ years under normal operating conditions

  • Warranty: 12-month materials/workmanship + 20-year no-leak conditional warranty


📦 Shipping & Handling

  • Packaging: Flat-packed steel panels and liner

  • Shipping Weight: ~6,000–7,500 lbs (estimated)

  • Shipping Method: Containerized freight

  • Delivery Time: 10–12 weeks (from receipt of order & deposit)

  • Installation Time: ~3–5 days with certified crew

  • Site Prep: Level pad with compacted sand or concrete ring beam

  • Installation Requirements: Forklift or crane required for unloading

Ratings And Reviews
Items have been added to cart.
One or more items could not be added to cart due to certain restrictions.
Added to cart
- Can't add this product to the cart now. Please try again later.
Quantity updated
- An error occurred. Please try again later.
Deleted from cart
- An error occurred. Please try again later.